
About this project
A tailored edge protection solution for the installation of new underground fuel tanks at Z Station Mana. When it comes to industrial works, safety is non-negotiable — our team made sure the excavation site was fully compliant and secure, providing WorkSafe-standard edge protection around the open pit throughout the fuel tank installation. With heavy machinery operating in the excavation below and active forecourt operations continuing nearby, the scaffolding edge protection system kept the crew safe and the project on schedule. This is the type of specialised industrial scaffolding we deliver across Wellington, Porirua, and the Kapiti Coast — built right, compliant every time.