
About this project
Rear and side elevation view of the same Trentham new build at cladding stage — the stair access tower is visible on the left, giving the building trades safe, easy access between levels without ladders. Our truck is on site and the bin hire skip in the foreground gives a sense of the scale of the structure. Full perimeter access, multi-level platforms, and the whole system erected before the cladding crew arrived. This is exactly the kind of staged scaffolding that keeps a new build programme running on time — we set up what you need, when you need it, and dismantle clean when the job is done. Upper Hutt new builds covered with no travel surcharge.