
About this project
Mid-installation aerial view of the temporary roof scaffolding frame going up over Avalon Primary School in Lower Hutt. The scaffolding structure was engineered to span the full roof footprint, providing a rigid framework for the shrinkwrap encapsulation that followed. This stage shows the precision required to install a temporary roof system over an occupied school site — coordinating with the asbestos removal and roofing contractors throughout. If your Lower Hutt or Wellington project requires a temporary roof scaffolding or shrinkwrap encapsulation, call 0800 ERECT IT for a free consultation and quote.